Given below, the details of minnumm steel requirement and maximum steel requirement.

Requirement of steel for an R.C.C Foundation = 56 to 89kg for one Cum of Concrete.

Requirement of steel for an R.C.C Pillar/ Column = 115kg to 144kg for one Cum of Concrete . Cross section area of steel in an R.C.C Pillar should remain between 0.8% to 6% of the Cross Section area of a Pillar.

Requirement of steel for an R.C.C Beam = 108kg to 125 kg for one Cum of Concrete . Cross section area of steel in a Beam should all the time be in excess of 0.15% of the total Cross Section area of Beam.

Requirement of steel for an R.C.C Slab = 56kg to 89kg for one Cum of Concrete .Cross section area of steel in a Beam should always be more than 0.15% of the total Cross Section area of Beam.

Requirement of steel for an R.C.C Retaining wall depends on earth / filling material should be kept to the height of wall, thickness of wall should be settled . Steel requirement is also based on these factors.

Requirement of steel for an R.C.C wall of an over head Water storage tank :-

Requirement of steel will be based on the quantity of water to be preserved and height of tank from ground level . Before making the final design, wind effect should also be taken into consideration.

Requirement of steel for an R.C.C wall of a water storage tank should remain under ground level.

Requirement of steel for this tank will be under that of an over head tank.